Upstairs Construction Begins
Construction | (0)
So there wasn't a lot of framing to be done upstairs, but the contractor I hired (Chris) is doing an excellent job. He mentioned that the house was "built well" because most of the existing walls were plumb and level. That's always good news.
There were 3 areas of construction upstairs:
1. Header & Bar Wall: The new open header between the kitchen/dining and living areas, and the small bar-wall that will be connected to the island.
2. The Bathroom Closet: this small closet is being closed off in the hall, and moved into the hall bathroom for towels, etc. (It will ...