I haven’t posted for a few days, and there’s been a lot of things going on at the house. The electrician wrapped up, so did the plumber (who also ran the gas lines), and the drywall is up and ready to mud. The upstairs construction should be wrapping up this week. Here’s a few shots I took tonight to show the progress:
Here’s one looking toward the kitchen.

Here’s one looking toward the hallway. You can see the new cans in the ceiling, the covered up closet (moved into the bathroom), and the new utility closet with washer/dryer hook-ups a the end of the hall. The swamp cooler hole in the ceiling had also been filled in.

Here’s one showing the plumbing in the hall bathroom, as well as the can light above the tub area.

Here’s the master shower plumbing.

Here’s another couple detailed shots, starting with the can above the kitchen sink, and some of the TV and telephone wiring in the kitchen. (Cause who can live without TV in the kitchen these days?)

Utility closet inside, and then showing the bedroom where we took 15″ from the closet. Not too shabby.

Master bedroom cans lights (and fan hook-up), and master bath fan/can.